欢迎来到毕设资料网! | 帮助中心 毕设资料交流与分享平台
毕设资料网
全部分类
  • 毕业设计>
  • 毕业论文>
  • 外文翻译>
  • 课程设计>
  • 实习报告>
  • 相关资料>
  • ImageVerifierCode 换一换
    首页 毕设资料网 > 资源分类 > DOCX文档下载
    分享到微信 分享到微博 分享到QQ空间

    外文翻译----PLC自动提高控制系统可靠性的方法

    • 资源ID:130509       资源大小:28.17KB        全文页数:10页
    • 资源格式: DOCX        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    外文翻译----PLC自动提高控制系统可靠性的方法

    1、 PLC automatic control system to improve the reliability 1. The main reasons for the lower control system reliability Although the main reason for the decline in industrial control system reliability and control aircraft PLC itself has high reliability But if the input signal to the PLC Switch mista

    2、kes analog signal larger deviations, Output PLC control by the implementing agencies do not require action, which will enable control of mistakes The economic losses caused irreparable. PLC wrong signal to the scene affect the importation of the main reasons are: 1. Signal transmission line caused a

    3、 short circuit or open circuit (due to mechanical shearing, their aging lines connecting dislocation). When the signal transmission line failure, the signal can not be transmitted to the scene PLC, the controlling mistakes. 2, the mechanical contact tremble, although close contact one scene, but tha

    4、t closed several PLC, Although the increase in the filter circuit hardware, software differential increased orders, but because PLC scan cycle is too short, it was possible to count, add up. Displacements orders mistake, error control results. 3, the transmitter site and switches their own fault, su

    5、ch as contact connections and Transmitter site reflects the normal work of non-electricity or larger deviations. These same fault control system will not function properly. Impact of implementing agencies to identify two main reasons: one, the contact is not reliable load control actions Although PL

    6、C issued a direct action, but did not request executive body movements. 2, starting inverter control, inverter own fault, no converter required to bring the electrical work. 3, various electrical valve did not open the solenoid valve is opened, the customs clearance can not place As the implementing

    7、 agency did not require action by the PLC control, the systems normal work, the systems reliability. To improve the reliability of the entire control system, it is necessary to increase the input signal reliability and accuracy of the executive body movements. Otherwise PLC should be able to promptl

    8、y identify problems and suggest ways to use sound and light alarm and other operators as soon as possible troubleshooting. Let safe, reliable and correct manner. 2.Designed Fault Alarm System Sound design fault in the alarm system in automatic control system design, we designed a three-level fault d

    9、isplay and warning system. 1 in the control of the control cabinet-level panel set up with the normal operation of the equipment and troubleshooting instructions light. When the corresponding light-normal operation of the equipment, the operation of the equipment malfunction indicator light to the f

    10、requency of 1Hz scintillation. Light bulbs to prevent damage to equipment not properly reflect the work, set up a specialized fault reduction / Test button lights. Continuous system operation any time by more than 3 seconds the button, all beacons should all brightened. If, at this time, there are n

    11、o instructions on the bright light shows are bad, they should be replaced after the light changed buttons reduction upon the state of the original work and display equipment operating status. 2-level fault show large-screen monitors set up in the center control room, equipment failure, written show

    12、faults, process flow diagram corresponding equipment flickered in the incident will be recorded in the history of failure. Level 3 indicates fault signal box located in the center control room, equipment failure, the acoustic signal boxes will be used. - Alarm suggested staff time fault. At fault, t

    13、he fault will classify some system failures is to stop the operation. But some little fault of the system, operating system fault zone, faults can be excluded from the operation. This will greatly reduce the entire system to stop the running time and improve system reliability operating standards. 3

    14、.Input Signal Reliability PLC input signal to the scene to improve the reliability, it is first necessary to choose the higher reliability of the transmitter, and various switches. Sign al transmission lines to prevent short circuit caused a variety of reasons, disconnected or have access to. Second

    15、, in the process of increasing digital filtering process and increase the credibility of the input signal. Design digital signal filtering methods are available, input contact at the scene after the one timer. Contact timing jitter and time based system to determine the response rate, the general in

    16、 dozens of ms.This can ensure stability in close contact indeed, the only other response. Analog filter design procedures are available on the spot for sampling analog signal three times D conversion rate and the sampling interval from the analog signal changes in the rate-determining. 3rd sampling

    17、data were stored in the data register DT10 and DT11 and DT12. When the last one after the use of data sampling, direct data exchange, data comparison of the maximum and minimum order removed. The median value of retained as a result of sampling DT0 were stored in the data register. In practical appl

    18、ication, and also to extend the sampling of the number of tools to achieve better results. Improve the reliability of signal and can be read into the PLC control system using their own characteristics, signal to determine the relationship between the degree of credibility. If for liquid level contro

    19、l, known as the size of the tank, the valve opening into the fluid and the fluid pressure is known. changes in a certain period of highly liquid tank is known about what extent, If given time Level PLC great difference in level data and estimates, judgments may be Level Fault, Failure to notify the

    20、alarm system operating officer of the Level. Another example is the ultimate protection Tank Level namely, when he switches to send signals PLC, and the signal is really reliable, in the process of the tank level when we turn signal and the signal, if it also limit Level Meter readings position Note

    21、 that the signal is true; If Level Meter readings not limit location. Level limit switch is the likely transmission of signal failure or fault lines. Similarly informed by the operator to address the alarm system failure. Because of the above methods in the design process, greatly improving the reliability of the input signal 4.Reliability implementing agencies


    注意事项

    本文(外文翻译----PLC自动提高控制系统可靠性的方法)为本站会员(泛舟)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583