欢迎来到毕设资料网! | 帮助中心 毕设资料交流与分享平台
毕设资料网
全部分类
  • 毕业设计>
  • 毕业论文>
  • 外文翻译>
  • 课程设计>
  • 实习报告>
  • 相关资料>
  • ImageVerifierCode 换一换
    首页 毕设资料网 > 资源分类 > DOC文档下载
    分享到微信 分享到微博 分享到QQ空间

    土木工程专业外文翻译---现浇楼板裂缝的产生与防治

    • 资源ID:130456       资源大小:50.50KB        全文页数:9页
    • 资源格式: DOC        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    土木工程专业外文翻译---现浇楼板裂缝的产生与防治

    1、roduction and prevention and cure of the crack of skyscraper Along with the speeding of town house construction step, not a few areas with small residences set up one after another, many inhabitants move continuously into the new residence, their quality to housing request is more and more high, par

    2、ticularly pay attention to very much to some cracks circumstances which sprinkle building plank to appear now, worry these cracks aring end will cause insecurity trouble, but in succession to building quality direct the section hurl tell. Such as once the some city develop a company to set up 6 laye

    3、rs of floor residence 16 totally, constructing area about 100,000 square meters, the brick mixs structure, the beginning repairs, one steps 2 box off with the brick wall, each ones establishing a turn of beam together building plank is togetherwhole to sprinkle, the plank thick 100 mms, concrete mar

    4、k number is C20, house long about with 80-90 ms, dont establish flexible sew, first floor is the 2.2 m garage layer, the C20 reinforcing bar cage of the foundation adoption infuses to note a stake.Its small areas turn to complete work in October,2003, finishing construction acceptance, didnt discove

    5、r obvious crack, discover the building plank appears crack when the inhabitant repair, past jointly to quality direct the section hurl tell, through step to see on the spot, 16 houses all exist the depth different crack.The crack width is between the 0.2 mms mms-0.4ses, the great majority of the cra

    6、ck position is placed in plank four Capes, the dynasty sun is more obvious.Hence, the Superintendent office of quality concerned, sinking to decline quantity and inclination degree to carry on a reexamination to the house first, result all in allow the scope, again look into construction diagram pap

    7、er to also match to request concerning the norm.Owing to above-mentioned circumstance, pass by hard analytical, the confirmation crack reason has the following what time: 1, cause now main reason of sprinkling the plank crack is the constringency of concrete, the concrete is in the nature the harden

    8、ing the process, because water evaporates continuously, but the physical volume gradual constringency, but the plank is on all sides to be subjected to a stipulation of, cant flex freely, so when the constringency of concrete cause to sprinkle knothole stipulation now should the dint exceed certain

    9、limit, certanly will cause to sprinkle plank to open crack now.And the crack part take place much at should the dint more concentrated Cape in the place-plank, but is mutually perpendicular with the Overcast angle line of wall 2, construct too early on the cast-in-place board , add and carry on ones

    10、 shoulder or back the crack caused. norm of inspection of quality of structural construction of concrete stipulates , before the concrete intensity reaches 1.2N/mm2, cant trample or install template and support on it . But developer , for race against time , catch up with progress , or concrete at ,

    11、 congeal and congeal stage after all for the first time still in water at the good cast-in-place board just, take up the post of purpose to trample, carry the material , concentrate on piling up fragment of brick , mortar , template ,etc. Premature adding and is carried on ones shoulder or back, has

    12、 caused the crack of cast-in-place board artificially. 3, the crack which the temperature change causes. As everybody knows, the cement condenses and hardens fast at room temperature, the characteristic such as being great of heat of hydration, especially in summer, after the concrete is built, the

    13、release amount of the heat of hydration is great, the concrete is under the high temperature, cant get and water maintenance in time , and desiccate and shrink, make concrete take place dry to split , result in fracturing finally. Investigation find in the majority board corner crack in , tan by the

    14、 sun towards the front directly the sun. 4, the house is crossed too long to set up the essential expansion joint , is the reason which causes the crack too. The developer is in order to save the land, often take the length of the house into account , make the house whole too long, set up expansion

    15、joint either, because of lack essential expansion joint, freedom flexible degree in house reach or exceed should set up interval that expansion joint require , will present the crack too. 5, the board is defeated by the muscle and sunk in the crack produced . In the course of constructing, because c

    16、onstructors operate barbarously, trample the reinforcing bar arbitrarily , cause and shoulder the muscle and sink, the antiabrasion layer is too big, reduce the sectional effective height of the board, make the bearing capacity of the board unable to reach the requirement of ones that design, thus c

    17、ause the production of the crack of board. Effective height, make the bearing capacity of the board unable to reach the requirement of ones that design, thus cause the production of the crack of board. How to prevent and cure the production of the board crack of cast-in-place board, according to the

    18、 construction experience for many years, offer some following prevention measures, suitable for consulting : 1, Do well cast-in-place board maintain , work , guarantee concrete intensity , prevent and cure important link that crack produce one of conscientiously. The norm stipulates , must cover and

    19、 keep maintenance warm in 12 hours after the concrete is built at room temperature, ordinary cement is no less than 7 days, if the one that ignored to concrete watered maintenance, on one hand it reduce concrete intensity, on the other hand it make concrete to be in the course of hardening too late

    20、to supplement the moisture, therefore lack water and produce the crack in a large amount. So do a good job of watering maintenance of concrete , can already reduce the crack that temperature produces , can also reduce the crack that the concrete shrink and produce . 2, cast-in-place board dont pass

    21、morning people , pile material , He Shi load , because concrete have a sclerosis course build , just have intensity; In this course , should maintain the concrete , cant exert any external force to the concrete . In a situation that the concrete has not had certain intensity yet , concentrate on , p

    22、ile up construction material or prop up mould stand , rest on it, that brought the cast-in-place board is not intensity like this, but more cracks. So, must make sure that just allow to trample or install template and support on it after the concrete intensity reaches 1.2N/mm2. 3, shoulder thickness

    23、 of antiabrasion layer of the muscle the strict control panel . Cast-in-place board shoulder muscle put , on board , have roof beam according to designing requirement through generally put on reinforcing bar of roof beam or stay with reinforcing bar lashing of roof beam cut off ,. For control good t

    24、o shoulder muscle antiabrasion layer thickness , must adopt 10 - 14 reinforcing bar horse stool, vertical-horizontal interval 800mm come fixed position to shoulder muscle from side to side, and with electric welding horse with shoulder muscle weld firm stool, make horse to be stool while the concret

    25、e builds non-wiping, guarantee , shoulder muscle sink, control , shoulder muscle thickness of antiabrasion layer effectively , make board shoulder muscle antiabrasion layer cross thick producing cracking. 4, control good sand , stone in a foot-path and mud content strictly. The thick sand in the cas

    26、t-in-place board should be selected for use, a stone of foot-path between 0.25-0.5mm, the mud content of grit cant exceed 1% . Sand, stone grains of foot-path careful and too light, mud content too big, will reduce concrete intensity, will make the concrete produce the crack finally. 5, dispose cert

    27、ain amounts of angle muscles in four corners of the board , radiate the muscle . Take place in board corner phenomenon this more to cast-in-place board crack, corner set up all around in boardThe length radiates the muscle for about 1800mm, so as to meet demands of angle stress of the board, the str

    28、ess sphere of action of making the cast-in-place board produce the crack conforms with radiation muscle, thus change and control the production of the crack effectively forced concrete structure reinforced with an overviewRein Since the reform and opening up, with the national economys rapid and sus

    29、tained development of a reinforced concrete structure built, reinforced with the development of technology has been great. Therefore, to promote the use of advanced technology reinforced connecting to improve project quality and speed up the pace of construction, improve labor productivity, reduce c

    30、osts, and is of great significance. Reinforced steel bars connecting technologies can be divided into two broad categories linking welding machinery and steel. There are six types of welding steel welding methods, and some apply to the prefabricated plant, and some apply to the construction site, so

    31、me of both apply. There are three types of machinery commonly used reinforcement linking method primarily applicable to the construction site. Ways has its own characteristics and different application, and in the continuous development and improvement. In actual production, should be based on specific conditions of work, working environment and technical requirements, the choice of suitable methods to achieve the best overall efficiency. 1、 steel mechanical link 1.1 radial squeeze link


    注意事项

    本文(土木工程专业外文翻译---现浇楼板裂缝的产生与防治)为本站会员(泛舟)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583