欢迎来到毕设资料网! | 帮助中心 毕设资料交流与分享平台
毕设资料网
全部分类
  • 毕业设计>
  • 毕业论文>
  • 外文翻译>
  • 课程设计>
  • 实习报告>
  • 相关资料>
  • ImageVerifierCode 换一换
    首页 毕设资料网 > 资源分类 > DOC文档下载
    分享到微信 分享到微博 分享到QQ空间

    双塔俯仰式缆机英文文献翻译

    • 资源ID:130159       资源大小:44.50KB        全文页数:12页
    • 资源格式: DOC        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    双塔俯仰式缆机英文文献翻译

    1、英文文献翻译 The Two LuCable Cranes General Description The 2 luffing cable cranes are destined for the construction of the Three Gorges Dam in the valley of the Yangtze River. The jobsite is situated near Sandouping, Yichang in the province Hubei in the Peoples Republic of China. The cable cranes, repres

    2、enting the main transport facility of a dam construction jobsite, have been designed for the purpose of transporting concrete, formwork items, concrete pre-fabitems, reinforcing material, building machinery and machine components such as penstocks, generators, lock gates, etc. . The cable cranes tha

    3、t will be used on the jobsite are of the luffing type, i. e. it has been given that name because for moving the track rope, the towers or masts one have to luff to the upstream or downstream direction. Both the slewing masts of each single crane between which the track ropes are installed, are situa

    4、ted -at an elevation of + 185 m on block 8 already concreted on the left bank and on the longitudinal coffer dam at the elevation of + 160 m. Each mast has a height of 125 + 25 = 150m, and is firmly anchored by rear stay ropes in longitudinal direction. On their sides, the masts are held respectivel

    5、y moved by 6-strand luffing ropes actuated by winches. The spans are: Rear stay ropes on the left bank approx. 270m Rear stay ropes on the right bank approx. 604.5m. Track ropes: approx. 1416m The machine houses for the winches of the cranes are arranged on the foot of the masts. In the machine hous

    6、es on the foot of the head towers are arranged the winches for hoisting crab traversing and mast luffing. In the machine houses on the foot of the tail towers are only situated the winches for mast luffing . This machine houses are therefore called luffing winch house . The control electronics are e

    7、ach located in separate rooms, for thus avoiding any problems as might occur by dust or also temperature variations. There are three possibilities to control the winches. Normally the crane is controlled by the drivers cabin that is movable between the machine side and the counter side on a long cab

    8、le. The second way is to control the cable crane by a -wireless portable control unit. For each crane there is one mobile unit. The third possibility to control the winches is the local control device nearby the machines for the hoist, crab traversing and luffing systems . The local control device i

    9、s for purpose of easy adjustment and repairing. Because of the local situation, there are certain areas of the working field with obstacles. These areas are locked by the programmable computer control system. For the control systems see also the Electrical documents of ABB Company. The crab traversi

    10、ng winch is driven by a DC-motor that allows for an infinitely variable speed regulation. For physics reasons he acceleration shouldnt be much beyond 0. 75 m/s2 . Thereof result acceleration and braking times of approx. 10 seconds (braking torque about 6000 Nm) ; respective path is approx. 37:5m. Wi

    11、th commissioning operations the mechanical brake shall be set in a way that the loaded crab will come to be stopped after at the latest 12 seconds (braking torque approx. 6000 Nm). Because of the varying loads will result otherwise with merely mechanical braking (emergency) shorter braking times. No

    12、rmally the torque having been generated by the motor is transmitted over a 2-groove drive pulley to the crab traversing rope. Here one has to check periodically for ensuring-an uniform running in the two grooves (see chapter Maintenance). Between the two grooves the crab traversing rope is led over the return pulley; at the shaft of which is also fitted :the


    注意事项

    本文(双塔俯仰式缆机英文文献翻译)为本站会员(泛舟)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583