欢迎来到毕设资料网! | 帮助中心 毕设资料交流与分享平台
毕设资料网
全部分类
  • 毕业设计>
  • 毕业论文>
  • 外文翻译>
  • 课程设计>
  • 实习报告>
  • 相关资料>
  • ImageVerifierCode 换一换
    首页 毕设资料网 > 资源分类 > DOC文档下载
    分享到微信 分享到微博 分享到QQ空间

    多绳摩擦式提升机换绳新工艺中英文翻译

    • 资源ID:128894       资源大小:115.50KB        全文页数:10页
    • 资源格式: DOC        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    多绳摩擦式提升机换绳新工艺中英文翻译

    1、外文文献 Multi-rope friction hoist rope for new technology Multi-rope friction hoist wire rope replacement, it is usually the use of four fixed steady string of new cars of old rope, process complexity, construction personnel and VI in the well shaft operations, the risk of larger and longer mine produc

    2、tion, So how to replace the main wire rope hoist such more security, time-saving, has been the goal of research 1、 Construction of preparation (1) in advance of the wedge-shaped hanging backup detection device on the new wire rope testing, in line with the Coal Mine Safety Regulations section of the

    3、 relevant provisions of 402, the measurement of size, were cut into four entangled in rope roller 4 on, according to the requirements of twist put on the north side of the derrick, and fixed. (2) North derrick hook in the appropriate location of the fixed beam-oriented round of four in order to smoo

    4、th movement of wire rope. (3) Automatic adjustment of leveling out the volume of the fuel tank of a lever, the first self-balancing so that the fuel tank of the South Hook extended the amount of leverage in line with the closure of the South Hook Balancing tanks at their respective cut-off valve, ru

    5、n 1 day, then the volume of check the fuel tank between the two hook lever out of the volume, and record, and as the basis for cut-off rope. (4)ready to use long and short board, long board needs three, the need for a short eight boards. (5) ready to adequate and reliable lighting facilities, as wel

    6、l as the signal, wire, wood, and commonly used tools such as I-steel, and check their eligibility. 2、 Construction of steps (1) top-down clean-up platforms, derrick and the shaft, removal of roller shield. VI well above the old string with new string, specific methods are as follows: Cans will be pa

    7、rked in the south tank top level VI and the location of wells; VI in wells adjacent to the north can take the work platform, the new rope through the window well wall Tabei VI and four driven wheels, and four cans of the old North ropes long, respectively, 3m, slightly smallbundled, tied for the new

    8、 Department3 (new ropein the old side). Specific binding is as follows: first one 3m long hemp rope around 1m intensive new rope, hemp rope and then the remaining entangled in the original location of the new justice will be the new and old ropes tied together, the hemp rope tied after water immersi

    9、on ( tied up a little wet before the small). At the same time, decentralization of the South can take the new string, using the same method with the above-mentioned firstsince the beginning of each new interval 10m rope firmly tied up with the old rope, wire rope when the new tankto the South side,

    10、and well above the first VI flush steel stops, can work to dismantle the North wellhead platform. in the four-storey tower platform wells, using a dedicated card in the North side of the tank 4prison in order to prevent the new rope to escape, and then cut off all of the hemp rope tied to the new an

    11、d the old rope rope separately. five-storey tower in the wells, the South side of the new cans with rope sling jail card board, with four new road will be the appropriate height of lifting rope to the main drive roller can not rotate a new justice prevail, then the human will be fourto the second fl

    12、oor of the new platform. (2) the South can head the new wire rope hook. the South Side can4 wedge-shaped with four back-up devices to connect firmly hanging; to the old and new wire rope hanging device of the alignment, the use of hemp rope tied firmly. the second floor on the first pressure hydraul

    13、ic pump with the South can automatically balance the fuel tank connecting pipe even after the good, the total cut-off to open the door a little to the fuel tank of the oil pump to suppress all Add, and then south automatic hydraulic hook Unicom balance tube to remove the fuel tank and on a designate

    14、d location. Finally, the slow decentralization of the Southern cage hook, a new extra rope taut. (3) shaft with a new rope. long sling to remove five boards and four sub-board anti-back channeling, and four new chairs were placed on the corresponding slot on the west side of the old rope suitable lo

    15、cation. Three-storey tower in the well platform, the South side of the new cans, the old rope a long board with a daughter card to pay in jail, and then in the long upper and lower sub-board 4 of the card to pay a small board. hoist speed with low-frequency southern decentralization cans, at the sam

    16、e time, four ropes to the corresponding roller speed put to justice; At this point, three-tiered platform in the wells south tower tank side, since the first sub-board pay long bundled together from every 6m hemp rope (the same method mentioned above) and timely water immersion, respectively, at int

    17、ervals of 50m to pay a small four-card sub board. When the second floor of the North can wellhead platform close to parking, with the end of rope. (4) the replacement of the South four wedge-shaped cage hook hanging device. Well first of all in the four-storey tower, the south and east-west directio

    18、n of wire rope hook emission No. 2 2o I-beam, four in its placeabove, and the South Hookold jail 4. by the shearer two 20t chain hoist with hook cage will Northern; 1ot with two hoist, lifting cans Southern appropriate height, the replacement of the eastern side of the first two hanging devices, spe

    19、cific methods are: using 12.5mm rope hoist It would be cap and hydraulic telescopic self-balancing devicebody, followed by removal of the eastern side of the two wedge-shaped hanging type linked to the original device. Then, the first installation of the new East from the second wedge-shaped only ha

    20、nging device, and then install the East from the first wedge-shaped hanging new home. replacement of the west side of the two wedge-shaped hanging device, the replacement of finished hemp rope to use old and new wire rope hanging device firmly bundled counterpart. (5) in the second floor of the new

    21、wire rope cut-off platform, and a new wedge-shaped hanging rope and back-up device connected. (6) the replacement of the North hook hanging cage four wedge-shaped device. first pump pressure on the second floor of the North can fuel tank of the hydraulic self-balancing good even after the connecting

    22、 pipe, the total cut-off to open the door a little, the fuel tanks of the oil pump to suppress all Add, and then North hook automatic hydraulic Unicom balance tube to remove the fuel tank, put away. pull two hooks 20t hoist cage will Northern appropriate high level of lifting, running from east to west in accordance with the gradual replacement of the order of wedge-shaped hanging hook device north, the replacement of the end, removed the old rope, and to dismantle working platforms.


    注意事项

    本文(多绳摩擦式提升机换绳新工艺中英文翻译)为本站会员(泛舟)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583