欢迎来到毕设资料网! | 帮助中心 毕设资料交流与分享平台
毕设资料网
全部分类
  • 毕业设计>
  • 毕业论文>
  • 外文翻译>
  • 课程设计>
  • 实习报告>
  • 相关资料>
  • ImageVerifierCode 换一换
    首页 毕设资料网 > 资源分类 > DOC文档下载
    分享到微信 分享到微博 分享到QQ空间

    项目周期外文翻译

    • 资源ID:128761       资源大小:48KB        全文页数:12页
    • 资源格式: DOC        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    项目周期外文翻译

    1、山东科技大学学士学位论文 附录: 英 文 文献 与翻译 The Project Cycle If the question, ”What does the world bank do?” had to be answered in a few words, those words would be :”It lends for development projects.” The World Banks main business, that is, loans to those who have been carefully selected and prepared a comprehen

    2、sive assessment of, and strict supervision as well as the systematic evaluation of the particular item. Bank for Reconstruction and Development since their inception in 1946, and its subsidiarys soft lending institutions - the International Development Association (the IDA, 1961 operation was put in

    3、to operation), together provided a total of 3094 T for the hardware project development loans and soft loans, the total has more than 92 billion U.S. dollars. The vast majority of these loans, that is, more than 90% for specific projects such as schools, agricultural production planning, dam, road c

    4、onstruction, and fertilizer plants. The Bank will focus on project loans, the World Bank to ensure that funds are invested reliable, productive principle of the project. These projects can promote economic development in borrowing countries, but also taking into account the ability to repay loans. W

    5、orld Bank is a development agencies, but also a financial institution, the loan for each project must be consistent with the characteristics of the dual. In recent years, the number of items and amounts of loans have significant growth. In the early 50, the World Banks annual loans of less than 20 p

    6、ens, a total amount of about 400 million U.S. dollars, and the vast majority concentrated in Europe and Latin America; in the 1967 financial year, a total of 67 loans totaling 1.1 billion U.S. dollars; in June 1986 ring the financial year, 青岛市委党校教学楼工程项目管理实施规划 approved a loan for 246 pens, the total

    7、amount of up to 12.3 billion U.S. dollars, respectively, to 90 countries. There has been no less a change in the character of projects. From lending countries, development strategy and project design of loans, the World Bank Loan of the growing tendency to develop. - Borrowing countries: a gradual s

    8、hift of loans in Asia, Africa and Latin America, poverty and the least developed countries. - Development strategy: the so-called progressives theory, that economic growth will eventually benefit the broad masses of the poor, the World Bank has been a more reasonable way to replace its urban and rur

    9、al poverty by increasing labor productivity in the population and the standard of living of the plan, the whole economy will accelerate the eradication of poverty and direct together. - Sector: the focus from infrastructure and industry to a wider range of projects, only to speed up the development,

    10、 provision of basic services and improving income distribution. Although the infrastructure is still important, but the bandwidth of the scope of the World Bank has developed and extended to agriculture and rural development, roommates and gas, urban construction and public facilities, water supply

    11、and sanitation comfortable, small business, education, health care, population and nutrition in all its aspects. - Project Design: new and traditional pay more attention to the various sectors of the distribution of income and employment, the development of regional resources and technology developm

    12、ent institutions, generous talent, the impact on the environment and the elimination of the shackles of social and cultural issues. However, the World Bank has always been attention to the role of the market, possible price, quality linked to you and, where feasible, to 山东科技大学学士学位论文 recover the cost

    13、 of the project to ensure the proper maintenance of the project and reconstruction of the areas of concern have also increased. This evolution in the development orientation-and in the quality-of bank lending can be illustrated, at the risk of oversimplification, by comparing a “typical” loan of the

    14、 1950s with a “typical” loan of the 1970s. 50s loans may be used for a middle-income developing countries the construction of power plants. By foreign consultants to design and supervision, foreign contractors and suppliers responsible for the implementation of the foreign staff to assist in the man

    15、agement of projects, from a certain sense, the project is taking abroad. As the project management organization in the analysis, the World Bank for the project technical and financial feasibility analysis. But he really the project in the energy sector in the context of the situation in which, power

    16、 distribution, fees structure of the standards and the impact of electricity consumption, such as the lack of sufficient attention. 70s loans may be used to fight a low-income rural development in developing countries. The project provided a complete set of goods and services (including ancillary fa

    17、cilities, credit, marketing, storage, infrastructure projects and studies, etc.) in order to improve the lives of rural productivity and book reviews. Expand the existing local public institutions or the establishment of new institutions; in a wide range of co-ordination of training programs, to mak

    18、e full use of local talent; to promote low-cost design and application of appropriate technology, again for local contractors and suppliers to provide more opportunities; in the project to establish a monitoring and evaluation system to help coordinate the implementation of the project and lessons learned


    注意事项

    本文(项目周期外文翻译)为本站会员(泛舟)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583