欢迎来到毕设资料网! | 帮助中心 毕设资料交流与分享平台
毕设资料网
全部分类
  • 毕业设计>
  • 毕业论文>
  • 外文翻译>
  • 课程设计>
  • 实习报告>
  • 相关资料>
  • ImageVerifierCode 换一换
    首页 毕设资料网 > 资源分类 > DOCX文档下载
    分享到微信 分享到微博 分享到QQ空间

    外文翻译---土石坝的特征及筑坝技术控制

    • 资源ID:127340       资源大小:27.30KB        全文页数:8页
    • 资源格式: DOCX        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    外文翻译---土石坝的特征及筑坝技术控制

    1、附 录 英文论文 The characteristics of earth-rock DAMS and technical control 1. selection of embankment type In general, there are two types of embankment dams: earth ( earth fill dam) and rock fill( rock fill dam) . The selection is dependent upon the usable materials from the required excavation and avai

    2、lable borrow. It should be noted that rock fills can shade into soil fills depending upon the physical character of the rock and that no hard and fast system of classification can be made. Rocks which are soft and will easily break down under the action of excavation and placement can be classified

    3、with earth fills. Rocks which are hard and will not break down significantly are treated as rock fills. The selection and the design of an earth embankment are based upon the judge ment and experience of the designer and is to a large extent of an empirical nature. The various methods of stability a

    4、nd seepage analysis are used mainly to confirm the engineers judge ment 2. freeboard All earth dams must have sufficient extra height known as freeboard to prevent overtopping by the pool. The freeboard must be of such height that wave action, wind setup, and earthquake effects will not result in ov

    5、ertopping of the dam. In addition to freeboard, an allowance must be made for settlement of the embankment and the foundation which will occur upon completion of the embankment. 3. top width The width of the earth dam top is generally controlled by the required width of fill for ease of construction

    6、 using conventional equipment. In general, the top width should not be less than 30 ft. if a danger exists of an overtopping wave caused either by massive landslides in the pool or by seismic block tipping, then extra top width of erosion resistive fill will be required. 4.alignment The alignment of

    7、 an earth fill dam should be such as to minimize construction costs but such alignment should not be such as to encourage sliding or cracking of the embankment. Normally the shortest straight line across the valley will be satisfactory, but local topographic and foundation conditions may dictate oth

    8、erwise. Dams located in narrow valleys often are given an alignment which is arched upstream so that deflections of the embankment under pool load will put the embankment in compression thus minimizing transverse cracking. 5. Abutments Three problems are generally associated with the abutments of ea

    9、rth dams: seepage, instability, and transverse cracking of the embankment. If the abutment consists of deposits of pervious soils it may be necessary to construct an upstream impervious blanket and downstream drainage measures to minimize and control abutment seepage. Where steep abutments exist, es

    10、pecially with sudden changes of slopes or with steep bluff, there exists a danger of transverse cracking of the embankment fills. This can be treated by excavation of the abutment to reduce the slope, especially in the impervious and transition zones. The transition zones, especially the upstream, s

    11、hould be constructed of fills which have little or no cohesion and a well-distributed gradation of soils which will promote self-healing should transverse cracking occur. 6. stage construction It is often possible, and in some cases necessary, to construct the dam embankment in stages. Factors dictating such a procedure are: a wide valley permitting the construction of the diversion or outlet works and part of the embankment at the same time; a weak foundation requiring that the embankment not be built too rapidly to prevent


    注意事项

    本文(外文翻译---土石坝的特征及筑坝技术控制)为本站会员(泛舟)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583