欢迎来到毕设资料网! | 帮助中心 毕设资料交流与分享平台
毕设资料网
全部分类
  • 毕业设计>
  • 毕业论文>
  • 外文翻译>
  • 课程设计>
  • 实习报告>
  • 相关资料>
  • ImageVerifierCode 换一换
    首页 毕设资料网 > 资源分类 > DOCX文档下载
    分享到微信 分享到微博 分享到QQ空间

    外文翻译---无级绳卡轨车应用

    • 资源ID:126347       资源大小:47.43KB        全文页数:7页
    • 资源格式: DOCX        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    外文翻译---无级绳卡轨车应用

    1、No application level rail cars Shengka Abstract: Bangladesh coal mine in the roadway without 311 wind Shengka rail cars of the successful application to solve the roadway several times because of varying slope ups and downs and turning the winch and transport equipment, transport interchange and the

    2、 more complicated transport links, Inclined Drift transport safety management of the difficult situation, greatly reduced the labor intensity and improve the labor efficiency and safety. Keywords: rail cars; efficiency; labor intensity; security 1, Overview 311 Face wind length of 1070 meters Lane,

    3、the roadway ups and downs four times, the greatest slope of 18 degrees, turning to a 170, 330, transportation from seven JD 11.4 scheduling winch to face shipment of materials. Staff cars have to go for the winch, trailers, low efficiency, workload and labor intensity than the larger and more use of

    4、 electrical equipment, I double mining process for the mine, to bring electric management very difficult. In order to change the status quo, to overcome these shortcomings, I wind mine on the roadway mode of transport was improved. 2, rehabilitation programmes Through research and feasibility studie

    5、s, I decided to mine 311 wind Lane, install a no class rail cars Shengka replace the original seven JD 11.4 scheduling winch as a means of transport. The card rail cars to the track gauge to 600 mm, rail 18 kg/m 24kg/m orbit, the largest slope up to 230, level radius of curvature 9 m, vertical radiu

    6、s of curvature 15 m. 3, no class rail cars Shengka the main technical parameters: I selected the model for mine: KWGP 40/600J Technical details: 1) Rated traction 40KN 2) winch speed traction 0.7m/s 1.5 m / s 3) traction rope diameter of 6 19 20 1670 Single rope P = 1.429Kg / m 4) certificates tract

    7、ion rope cars themselves G0 = 3t 4, card rail cars and structure of the working principle No Shengka class rail cars throughout the system from some traction (Electronic Control), vehicles, track and rope oriented communication and contact, such as four major components. 4.1, part of the Promise tra

    8、ction rope winch, rope, tension, etc. composition. (1) Two rope winch drum Promise Promise rope winch rail cars card system is the driving force, by winch Zhusheng round of friction between the rope and have traction, thus boosting traffic. Zhu Sheng in the rope round the corners to 540 , using mech

    9、anical winch, simple structure, the use of reliable. Flameproof motor optional two speed motor, the power of 45 KW 90KW. Reducer for DCY280 type, double winch drum structure, a drive drum, a drum oriented, driven roller installed on 12 fast with groove round lining to avoid a bite to justice issues.

    10、 (2) Tension Tension with the layout near the winch used to absorb the elongation of wire rope, using heavy Tuo tension, there are five and three take up of tension with. Each five absorbing tension wire rope elongation for six meters. Pretorias role is to ensure that winch wire rope and always main

    11、tain a certain tension. 4.2, vehicles Reserve some vehicles, including traction rope (brake) in the car and the truck. Traction rope certificates for the vehicles for vehicles, body, the Reserve rope extinguishers, traction arm, rope fixtures, and the two Shengtou fixed rope in the car, and to more

    12、than rope entangled in its ropes on the tube Reserve On. The rope winch traction transmitted to the tractor, the tractor to promote all kinds of trucks running. 4.3, and the round of the track (1) vehicles running track for 18 kg / m track gauge to 600 mm. According to the actual track, installation

    13、 of pressure rope round, Tuosheng round, the rope round lead, guide rope round corners of the round, and so, under normal circumstances every 15 20 meters to install a group of Tuosheng round. In the larger Aochu under pressure to install rope round the corner to be anchored to a fixed so that the r

    14、ope has always been to the track along the layout. (2) to justice Station (end of round) To stand by the rope to rope round, made up of the framework, to bring to justice the bridge station, station sites to anchor rope fixed or fixed point, not a cement foundation. 4.4, communications devices Use o

    15、f communications signal leakage communication devices, including base stations, or machines, such as cable leakage, can be realized with the winch driver and truck drivers between the RBI and a call contact. 5, rail cars using the card to be noted: (1) winch driver should be training posts. (2) car

    16、drivers should obey the command with the truck driver did not hear the signal can not be driving by car. (3) drive tractor drivers should pay attention to the direction of the road, when the winch is running an unusual noise, wear lining round (round of general lining wear 20 mm should be replaced).

    17、 If found lining round of uneven wear, should immediately be lining round edge. (4) winch motor should first blackout, according to the safety regulations the relevant provisions of wiring, cables firmly. (5) reducer should be six months to replace a gear box oil (No. 150 industrial gear oil); reduc

    18、er check whether there are abnormal permeability, oil spills phenomenon. (6) winch driver should always observe the operation of wire rope, wire rope suddenly found running loose or should not stop in time, asked after stopping there; rope found in a chaotic justice, should be brought to justice thr

    19、ough the timely re parking, tight rope. (7) According to regulate the use of brochures putting brake fluid, brake fluid putt to quickly secure braking and braking. (8) rope optional 6 19 or 6 X (19) Xilu rope fiber core oil free rope without a rope winch drum can Oiler rust proof. According to the l

    20、ength of wire rope for the use (or less on, as much as possible). The use of the safety of note: (1) should be strictly run time provisions for the Prohibition of pedestrians in the roadway (conditional ore can be allocated sound and light warning). Such as roadway width larger, can track the cordle

    21、ss side as the sidewalk, the width of the sidewalk should be not less than 700 mm, and width of smaller roadways, they should at about 100 m in the cordless side alley to help staff avoid a cave. (2) with the truck drivers in traffic in the process should always pay attention to traffic in front of

    22、the normal track, track whether the debris impact on vehicle operation. (3) when the pedestrian is prohibited personnel riding rope walking. (4) turn in the rope walk outside. (5) or vehicle lane ramp, the officers should not be in the vehicle at the bottom. 6, the effect of Promise Shengka rail car

    23、s used mechanical means, compact and easy to operate, and easy maintenance. I face the wind mine 311, Lane 7 to replace Taiwans relay transport scheduling winch, and face, roadway equipment, materials not reproduced for transport. Under the specific use: 1, transport capacity, high transport efficie

    24、ncy To achieve long distance changing slope and turning the roadway for the transport, saving way to pick linked to the links, improve work efficiency, reduce the transport time, single trip transport capacity is small winch scheduling of two or three times. 2, ease of installation, simple operation

    25、 Card system uses common rail car track, the track easy installation, the system installed, each class need only two or three people (one driver, the vehicle with 1 to 2), with the vehicle carrying armed with base stations at any time with the winch RBI drivers or calls. 3, security, good Singapore

    26、changed in the roadway and turning the track for an increase of bends in the course of the whole transport rare cars and trucks out of Road; goods for transport to reduce the staff to pick linked to a decrease of hidden causes of accidents; holding the use of the base stations With the vehicle and the driver can always contact in an emergency situation may at any time stop, emergency stop, only when Cut with the handheld base stations on the reset button reset, the winch driver to drive, safe and reliable. 4, the proposed


    注意事项

    本文(外文翻译---无级绳卡轨车应用)为本站会员(译***)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583