欢迎来到毕设资料网! | 帮助中心 毕设资料交流与分享平台
毕设资料网
全部分类
  • 毕业设计>
  • 毕业论文>
  • 外文翻译>
  • 课程设计>
  • 实习报告>
  • 相关资料>
  • ImageVerifierCode 换一换
    首页 毕设资料网 > 资源分类 > DOC文档下载
    分享到微信 分享到微博 分享到QQ空间

    铁道运输外文翻译--基于多目标规划的铁路枢纽客运站布局优化研究

    • 资源ID:126124       资源大小:419.50KB        全文页数:16页
    • 资源格式: DOC        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    铁道运输外文翻译--基于多目标规划的铁路枢纽客运站布局优化研究

    1、 Study on Layout Optimization of Passenger Station based on Multi-objective Planning AbstractThis paper study on the optimal layout of passenger station and the basic principle of selection location. There are both quantitative index and qualitative index existing in the evaluation indexes of the la

    2、yout of passenger station. To unify the evaluation indexes, this paper establishes a multi-objective planning optimization model of the layout of passenger station, by using the basic idea of multi-objective planning and introducing the effect of targets of the evaluation indexes. In Nanning railway

    3、 terminal for example, four evaluation indexes: construction investment、operation cost in railway terminal、 cost of passenger trip and the other social benefits are determined. Calculate respectively all effect of targets of the evaluation indexes and then determine the optimal scheme of the layout

    4、of passenger station in Nanning railway hub by the total effect of targets after being weighted. Keywords-component; multi-objective; passenger station; Layout Optimization In the past, paying much attention to improving line carrying capacity and neglecting the carrying capacity of hubs or stations

    5、 in China leaded to the shortage of passenger capacity and the difficulty in meeting the demand of transport market. At present, China is in the primary stage of high-speed railway construction. High-speed railway being introduced into existing railway terminal will break the transport pattern of ex

    6、isting railway hub and will dramatically change the original railway hub transportation structure、 transportation operation mode and transportation path. It is an important question in railway terminal planning to reasonably determine the locations and the number of the high-speed passenger stations

    7、 in hub and optimize the layout of passenger stations in terminal. I Layout Optimization model of Passenger Station in railway hub A. Layout of passenger station in railway hub and basic principle of selection location ( 1) For human-oriented, make the trip distance and time of passenger from the st

    8、arting point to passenger station shortest、 the travel cost lowest、 the riding most convenient and reduce the passenger transfer or make it more convenient. (Including the transfer between one or multiple transport modes) ( 2) Take the market as the direction and make the benefits as the center. Pas

    9、senger station in city is kind of large infrastructure. Inputs and outputs should be the standard of the evaluation of railway operation benefit. At the same time, removal expense which is relative to the selection location of passenger station、 investment of civil engineering、 completion time of pr

    10、oject and some cost related to project should be brought into the constraint condition of selection location of passenger station. It still needs to compare the operating costs of different schemes of selection location of passenger station. ( 3) The development of city should be combined with the c

    11、ity planning. It includes urban master planning、 urban public transport planning、 urban rail transit network planning and so on. Their evaluation indexes are different. In a word, it should reflect the compatibility between railway station and the city, and guide and advance the development of the t

    12、ransportation of the city. 3 On above foundation of all basic principles, alternatives should be in accordance with the natural distributed discipline of passenger flow, and be beneficial to hub passenger train. They also should make full use of the railway existing equipment and the urban existing

    13、collecting and distributing centre. At the same time, they should have both good geological conditions and economic environment. B. Layout Optimization model of Passenger Station in railway hub The economic evaluation indexes of layout optimization model of passenger station in railway hub have both

    14、 quantitative indexes such as engineering investment、operating costs and so on and some qualitative indexes which cant be quantified directly such as cooperation with the development planning of city、 environment protection and so on. To be convenient to unify quantitative indexes and qualitative in

    15、dexes, establish layout optimization model of passenger station below by applying the theory and method of multi-objective planning. 1m ax I iiif w f ( 1) In formula: i Quantitative indexes and qualitative indexes of all design schemes. I evaluation indexes in all; if Effect of targets of all evalua

    16、tion indexes( 01if) . It is introduced for be convenient to unify the dimension of quantitative and qualitative indexes. For the effect of targets of quantitative indexes, determine the corresponding value of zero and one, and then evaluate the value through insertion method. For the qualitative ind

    17、exes, use the six-degree standard to quantify: Best1、 Better0.8、 General0.6、bad0.4、 worse0.2、 worst0. iw Weight of all evaluation indexes. It can be confirmed by the means of investigation and argumentation and experts. In addition, 11I iiw . f Total effect of targets of all design schemes. Its valu

    18、e determines the final good or bad ranking of all design schemes. II Construction scheme of passenger station in Nanning railway hub A. Present situation and future planning of Nanning railway hub Nanning railway hub is the important regional terminal in southwest railway network. At present, it is

    19、connected with three railway main lines: Hunan-Guilin line、Nanning-Kunming line and Nanning-Fangchenggang line. The constructing line: Liuzhou-Nanning passenger dedicated line、 Nanning-Litang railway、 Yunnan-Guilin railway and Nanning-Qinzhou railway all introduced into Nanning hub. Recently, there

    20、will be Jinchengjiang-Nanning railway、 Naning-Pingxiang railway and so on introduced into Nanning terminal. At that time, the number of intersection railway lines will be nine in Nanning hub. In terminal , therere only one passenger stationNanning Station. It has five receiving-departure lines for p

    21、assenger trains (including main line)、 one freight through line、 four receiving-departure concurrently storage sidings、 four shunting lines. The population of Nanning in downtown is planning to be 69 million in 2010 and 78 million in 2020. The population of the center is planning to be below 21 mill

    22、ion in 2010 and below 29 million in 2020. The existing layout of railway terminal is in loop mode. Affected by geological condition and features、 the limit of removal working, existing passenger station cant be reconstructed in large scale. All of passenger working being concentrated in a station leads large pressure to city traffic. Therefore, the layout mode should be that


    注意事项

    本文(铁道运输外文翻译--基于多目标规划的铁路枢纽客运站布局优化研究)为本站会员(译***)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583