欢迎来到毕设资料网! | 帮助中心 毕设资料交流与分享平台
毕设资料网
全部分类
  • 毕业设计>
  • 毕业论文>
  • 外文翻译>
  • 课程设计>
  • 实习报告>
  • 相关资料>
  • ImageVerifierCode 换一换
    首页 毕设资料网 > 资源分类 > DOC文档下载
    分享到微信 分享到微博 分享到QQ空间

    建设项目管理中英文外文翻译

    • 资源ID:125537       资源大小:42.50KB        全文页数:10页
    • 资源格式: DOC        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    建设项目管理中英文外文翻译

    1、Construction Project Management Value Engineering By:Fredrick E.Gould.Nancy.E.Joyce ABSTRACT Value engineering is a kind of in the world proved very fruitful way of project management. In our country, with the improvement of socialist market economy, value engineering, whether in theoretical researc

    2、h or practical application aspects, obtained greater progress, and is gradually applied to engineering project management. Due to the construction of the project design stage investment is less, the owners often ignored this phase of the application of value engineering, but the practice proof, desi

    3、gn phase is the possibility of managing investment the biggest stage. Therefore, this paper based on the design stage of a construction project, study the application of value engineering. Key Words: construction project; value engineering; design stage Value engineering and cost reduction are often

    4、 confused, so that the value engineering in the designer had a bad reputation, however, it is important that value engineering is a process, is to consider the cost of other factors, such as: life cycle cost, quality, durability and maintainability. On the other hand, reduce cost, think only reduced

    5、. At the same time they are in rely on a given standard role, we consider in the larger context of the standard, while the other reaction activity is only for budget problem. The project team should be very clear in their processes are involved in. Despite the tight budget reduces life cost, the own

    6、ers need to know exactly what he or she buys. Value engineering in the process, should the owner to another system reference to buy items or equivalent value system to reduce the cost. In reducing cost in order to save money, he or she is of little value or range less. Value engineering is all desig

    7、ned products in the active part. Value engineering is not done enough time, reduce cost becomes necessary. Value engineering provides a better reduction mode, and reduce the cost can be reduced by engineering quality or quantity, save money. Value engineering is not limited to the construction indus

    8、try, but in the business world to help analysis is to minimize the cost of the optimal value of object technology and products. The best value is not an intrinsic property of. For each project, it takes on a different meaning, often in other similar product comparison. In the construction which is c

    9、omparable to many products, it is a complicated job. Therefore, value engineering is as one of the best team in good operation. Value engineering is one of the reasons for negative take designers sometimes feel, architecture is a measure of their work and suggestions, damage the item aesthetic quali

    10、ty. In the process if the designer is an equal partner, this feeling will be reduced. At the same time, the owners need to fully understand the design ideas to make the choice, when the time came, to a specific recommendations for proper balance, to accept or reject. Owners of professional designers

    11、 and construction with the help of setting standards. In general, these standards are divided into several categories: best cost, the best optimal function and aesthetic value. Determining the optimal cost for life cycle cost analysis to the building, using the most effective play a role definition.

    12、 The best aesthetic value, can be difficult to determine, but as with other important criteria. As an important emergency generator case, the team focused on cost and function, but they do not concern for aesthetic values, because the generator will be hidden from view. It takes the first consider t

    13、he cost, durability, and reliability. Its role will be in accordance with safety requirements and the buildings within the residents needs to decide. In a curtain wall system, the owners pay attention to the cost, function and aesthetic value. Because the system will be the main architectural image,

    14、 aesthetic value may cost more than the weight, exceeding even function. These are only the owner can decide to make the final. Including value engineering, all items are redundant. After all, is not a design team to put together the best solution, it finds the optimal solution will satisfy the owne

    15、rs cost, functional, aesthetic standards. Of course, a good design team is doing. However, every design company established culture also needs to be questioned standard practice. In the value engineering in the process, he could do it. In addition, some teams may be dealt with as soon as possible in

    16、 the design of the case. For example, the owner should accelerate the job to get the project started construction. Its purpose is to return to the previous fact and is not easy to make a decision before the state. Value engineering to ensure that such errors do not occur. Another possibility is that

    17、, the owners have vision, but does not fully explain to the designer. Designer response more complexity, to meet the needs of the owners. Value engineering process, this complexity will be questioned and clarification. Building professionals in their occupation career into contact with many design c

    18、ompany. Specific design company may not know they brought other products and processes form information. In value engineering, these ideas will be checked, and where appropriate, set down. Building professionals can easily acquire about certain product availability information. If a product needs a

    19、very long distance transport, which can increase the cost of. Maybe there are local products, can also achieve the same standard. Although the value engineering in the project construction and even in the construction industry as a whole is pale, the maximum value is obtained in the earlier process:

    20、 from one system to another, in the schedule have hardly any effect, and the amount of redesign and redraw is minimized. However, in the early stages of design, to produce any saving document is one of the most difficult, because there are usually no formal drawings or plan. The most recognizable ef

    21、fects occur in the schematic diagram of the final and the design and development stage of early. There is enough information on the idea of rational judgment system. Of course, most of these savings can be achieved. In construction drawing, macroscopical idea is already in place, and most of the ideas embodied in the file details. During the construction process, value engineering efforts continue. Because making changes to the project, design development should follow in the design phase to assess changes in the procedure. Contractors can also in the field of application of


    注意事项

    本文(建设项目管理中英文外文翻译)为本站会员(泛舟)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583