1、三江学院 毕业设计 (论文 )外文资料翻译 附件: 1.外文资料翻译译文(约 3000 汉字); 2.外文资料原文 (与课题相关的 1 万印刷符号左右 )。 指导教师评语: 指导教师签名: 年 月 日 院 系 土木工程 专 业 建筑工程 学生姓名 许学斌 班级学号 B08084066 外文出处 Knight M A, Mitchell R J. Modeling of light non-aqueous phase liquid (LNAPL) releases into unsaturated sand .Canadian Geotechnical Journal, 1996,33, 33
2、:913-925 . Bored pile Summary Drill ( flushing, dig ) pile from the nineteen sixties, beginning in Henan province Nanyang region since the development application, because of its many advantages, has been widely used in soft soil, loess, including soil, expansive soil and other special types of foun
3、dation and industrial, civil, municipal, railway, highway, port and other types of Engineering practice. And precast pile, bored pile construction of no noise, no vibration, on the surrounding buildings and small environmental impact, pile diameter, buried deep, large bearing capacity. Chinas drilli
4、ng pile maximum diameter of pile has reached 4000mm, maximum deep pile has reached 104m, and the steel pipe pile maximum diameter of 1200mm, the largest pile of prestressed concrete pipe pile with deep 83m, maximum diameter of 1300mm, the biggest pile depth 40m. Along with our country socialist cons
5、truction is booming, with high-rise buildings, large span bridges on the rise, the bearing capacity of pile foundation with higher requirements. Large diameter bored pile therefore gets rapid development, pile length and pile diameter also do bigger more. However, in the existing various methods of
6、pile, bored pile has many advantages and is widely used in construction, but it is hard to avoid the impact of mud, which not only reduces the bearing capacity of pile expectations, but also caused a serious waste of materials. Manual hole digging pile is difficult to achieve greater depth, its bear
7、ing capacity is also difficult to just as one wishes. In view of bored pile in this situation, how to improve the pile construction technology level, make the input material to be more reasonable to use, so as to greatly increase the bearing capacity of single pile in engineering field, have become
8、hot issues in recent years. The introduction of bored cast-in-place pile Perfusion pile refers to the construction site by mechanical drilling, steel pipe soil compaction or human mining method in the foundation pile hole in form, and on its inner placed reinforcement cage, concrete made with differ
9、ent pile, drilling method, grouting pile can be divided again for cast-in-place pile, bored pile and digging several types of piles. Bored pile by pile into the definition and classification of a kind of pile. The characteristics of bored cast-in-place pile 1、 And sinking pile of hammering method, c
10、onstruction noise and vibration is smaller 2、 To construct than the precast pile of large diameter of pile 3、 In all kinds of ground can be used 4、 The construction quality of the pile bearing capacity influence 5、 Because the concrete is in the mud perfusion is difficult to control, so the quality
11、of concrete Bored pile construction method Percussion drilling, punching grabbing drilling and rotary drilling hole can adopt slurry wall construction method. The construction process is: site formation, slurry preparation, buried tube and laying work platform rig and positioning, drilling, hole cle
12、aning and inspection of hole quality and lower steel cage, underwater concrete perfusion to pull out the barrel to check quality. Construction sequence: (1) the construction preparation Construction preparation comprise: selecting drill, drill, layout. Construction of bored pile drilling rig is the
13、main equipment, according to the geological conditions and various drilling machine applied to select conditions (2) drilling machine installation and positioning Istallation of drilling machine based if not stable, easy to produce in the drilling machine construction, pile and pile inclined incline
14、d eccentric and other adverse effects, therefore requires the installation of foundation stability. On the formation of softer, sloping ground, be bulldozed, the pad plate or tie reinforcement. In order to prevent the pile position allowed, construction is very important to the set the center positi
15、on and the correct installation of drilling machine, the rig drilling machine, first use of the power drill and near the cage with the drill pipe, moving roughly position, and then Jack rack jacking, accurate positioning, so that the lifting pulley, drill bit or fixed drill hole cards and casing cen
16、ter in a vertical line, in order to ensure the verticality of the drilling rig. Drilling position deviation is not more than 2cm. Aligned with the pile location, with sleeper flat drill beam at the top of the tower, and symmetrical to the drill axis pulling cable wind rope. (3) buried tube Undergrou
17、nd water level below the Kong Bitu under the hydrostatic pressure to the hole collapse, and even the phenomenon of flow of sand. If you can keep the borehole wall high underground water head, increase the hole hydrostatic pressure, to prevent collapse hole, hole wall. Casing in addition to play this role, at the same time, good isolation of surface water, ground, protecting the orifice pile hole drill guide fixed