欢迎来到毕设资料网! | 帮助中心 毕设资料交流与分享平台
毕设资料网
全部分类
  • 毕业设计>
  • 毕业论文>
  • 外文翻译>
  • 课程设计>
  • 实习报告>
  • 相关资料>
  • ImageVerifierCode 换一换
    首页 毕设资料网 > 资源分类 > DOC文档下载
    分享到微信 分享到微博 分享到QQ空间

    变电站外文翻译3

    • 资源ID:124932       资源大小:45.50KB        全文页数:7页
    • 资源格式: DOC        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    变电站外文翻译3

    1、 1 英文文献 Power System Substation is an important and indispensable component of the power it assumed the task of conversion and distribution of grid security and the economy play a decisive role in running is to contact the users power plants and intermediate links. With economic development, expandi

    2、ng grid capacity, reliability of operation of the power grid is getting higher and higher requirements. Development of science and technology, intelligent switches, photoelectric current and voltage transformer, a run-line state detection, training simulation Substation Operation matures, such as hi

    3、gh-tech, as well as fiber-optic technology, computer high-speed network system in the development of real-time applications, bound to the existing substation automation technology have a profound impact, all-digital substation automation system development trend. Keywords: substation automation Powe

    4、r system is operated by the production, transmission, distribution and consumption of a variety of power linked to the composition of electrical equipment. As a result of a large number of power can not be stored, we must ensure that the production of electricity and energy balance. With the scienti

    5、fic and technological advances in the technological development of our country has reached a certain level. Intelligent switches, photoelectric current and voltage transformer, a run-line state detection, training simulation Substation Operation matures, such as high-tech, as well as fiber-optic tec

    6、hnology, computer high-speed network system in the development of real-time applications, significantly increase the transformation degree of automation. Design of our substation substation cable programs tend to be simple, many of the recent domestic new 220 k V substation and 110kV voltage levels

    7、of wiring without the use of dual-bus bypass bus. The use of GIS, the priority sub-bus single wire. Terminal Substation, the line as far as possible, such as transformer unit wiring. A large number of the introduction of new technology, transformer substation rising level of electrical equipment, po

    8、wer distribution devices from the traditional form of moving toward oil-free, vacuum switches, SF6 switches and mechanical, electrical equipment combination of the development of small-scale integration. In recent years the world famous high-voltage electrical equipment companies have been developin

    9、g, the development of the various types of 145-550 kV outdoor high-pressure and ultrahigh-pressure combination of electrical appliances, some high-voltage switchgear 2 plant has also started production of 145 k V compact outdoor portfolio electrical appliances. Smart plug-in type outdoor switchgear

    10、is a more complete high-pressure and ultrahigh-pressure switch system, which includes electrical first and second equipment, as well as the associated fiber optic cable, such as plug-type compound. The entire distributed substation automation system; the introduction of advanced network technology;

    11、substation and the construction area covers an area of reduced substation program to simplify wiring, switchgear, bus and steel pipes, such as the use of stents to substation layout is more simple, the abolition of the former station area and optimize the layout to make a substantial decline in an a

    12、rea substation. With technological advances, the traditional relay protection devices are gradually being replaced by microprocessor-based protection. Microprocessor-based protection is referred to as the protection of PC computer, a digital relay protection, is based on the programmable digital cir

    13、cuit technology and real-time digital signal processing technology of the Power System Protection. At present, both at home and abroad have been developed to 32-bit digital signal processor for hardware-based protection, control, measurement, and data communications integration of microprocessor-bas

    14、ed protection control devices, and artificial intelligence technology into a number of relay protection, such as artificial neural networks, fuzzy theory to determine the realization of fault type, fault location, the direction of protection, the main equipment and other new methods of protection. B

    15、y means of wavelet analysis of the theory of digital signal failure of the entire frequency band information and to achieve fault detection. These artificial intelligence technology to improve the accuracy of failure to provide a means of identification, but also some single-frequency signal based o

    16、n the traditional method difficult to identify the problems to be resolved. At present, the microprocessor-based relay protection is along the microprocessor-based protection network, and intelligent, adaptive and protection, control, measurement, signal, data communications integration direction. T

    17、he most basic request that charged barbed wire net in the city circulates is safe and stable.The core problem of charged barbed wire net safety in the city stability wants to build up to be a with the city mutually accommodative of, reasonable of charged barbed wire net structure.This text passes an

    18、d programs to the charged barbed wire net with electric power and designs the technique principle of the aspect analysis.Elaborated the standard concerning electric voltage grade, power supply credibility, power supply ability and charged barbed wire net safe power supply 3 requests etc. some proble

    19、ms that should notice in the charged barbed wire net safety;And have already aimed at sexs elaborating request to the concrete design principle opposite charged barbed wire net safe power supply of the 220 kV transformer substation and 110kV transformer substation. How to promise power supply credib

    20、ility 1)Satisfy charged barbed wire net power supply safe standard.The power supply network satisfies the request of power supply credibility.The standard that all satisfies N-l, city area center high burden density important customer in the district satisfy the standard of N-2.Disallow transformer

    21、over carry.Help a southern city net power supply credibility rate index sign programming target is 99.99%. 2)Press to go together with charged barbed wire net burden to transfer ability in the city satisfy following request: The transformer substation loses any once enter line or one set lord transf

    22、ormer but lower power supply ability, win press to go together with charged barbed wire net to have to transfer burden to ensure the ability of power supply. When a female line of transformer substation stops a luck because of putting, winning to press to go together with charged barbed wire net sho

    23、uld have the ability that transfer all burden. When the 10 kv goes together with electric wire road any check to fix or breaks down, going together with the charged barbed wire net should have non- check of transfer to fix, non- breakdown segment ability for carrying.The non- check fixs, The non- br

    24、eakdown segment carries to the power is off time only for go together with to give or get an electric shock an equipments to pour a Zha operation for time. 3)Ask to satisfy a following principle while allowing the capacity of the power outage and the target of the instauration power supply while goi

    25、ng together with charged barbed wire net breakdown to make the customer the power is off: The customer of two back track power supplies , after losing a back track, should be unlimited to give or get an electric shock. The customer of three back track power supplies , after losing a back track, shou

    26、ld be unlimited to give or get an electric shock, again after losing a back track, should satisfy power supply capacity 50-70% is used an electricity. When all of a back track or much customers the power of back track power supplies stopped, resume target time of power supply broke down to handle for a back track restored of ask.


    注意事项

    本文(变电站外文翻译3)为本站会员(泛舟)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583