欢迎来到毕设资料网! | 帮助中心 毕设资料交流与分享平台
毕设资料网
全部分类
  • 毕业设计>
  • 毕业论文>
  • 外文翻译>
  • 课程设计>
  • 实习报告>
  • 相关资料>
  • ImageVerifierCode 换一换
    首页 毕设资料网 > 资源分类 > DOCX文档下载
    分享到微信 分享到微博 分享到QQ空间

    机械专业毕业设计外文翻译--工艺规程制订

    • 资源ID:117508       资源大小:25.36KB        全文页数:9页
    • 资源格式: DOCX        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    机械专业毕业设计外文翻译--工艺规程制订

    1、1 附录 Process Planning The product design is the plan for the product and its components and subassemblies.To convert the product design into a physical entity ,a manufacturing plan is needed .The activity of developing such a plan is called process planning .It is the link between product design and

    2、 manufacturing .Process planning involves determining the sequence of processing and assembly steps that must be accomplished to make the product .In the present chapter ,we examine processing planning and several related topics. At the outset ,we should distinguish between process planning and prod

    3、uction planning ,which is covered in the following chapter. Process planning is concerned with the engineering and technological issues of how to make the products and its parts. What types of equipment and tooling are required to fabricate the parts and assemble the product ? Production planning is

    4、 concerned with the logistics of making the product .After process planning is concerned with ordering the materials and obtaining the resources required to make the product in sufficient quantities to satisfy demand for it. Process Planning Process planning involves determining the most appropriate

    5、 manufacturing and assembly processes and the sequence in which they should be accomplished to produce a given part or product according to specifications set forth in the product design documentation.The scope and variety of processes that can be planned are generally limited by the available proce

    6、ssing equipment and technological capabilities of the company of plant .Parts that cannot be made internally must be purchased from outside vendors. It should be mentioned that the choice of processes is also limited by the details of the product design.This is a 2 point we will return to later. Pro

    7、cess planning is usually accomplished by manufacturing engineers .(Other titles include in industrial engineer.) The process planner must be familiar with the particular manufacturing processes available in the factory and be able to interpret engineering drawings .Based on the planners knowledge,sk

    8、ill,and experience ,the processing steps are developed in the most logical sequence to make each part .Following is a list of the many decisions and details usually include within the scope of process planning : .Interpretation of design drawings. The part of product design must be analyzed (materia

    9、ls,dimensions,tolerances ,surface finished,etc.) at the start of the process planning procedure. .Process and sequence. The process planner must select which processes are required and their sequence.A brief description of processing steps must be prepared. .Equipment selection . In general , proces

    10、s planners must develop plans that utilize existing equipment in the plant .Otherwise ,the component must be purchased ,or an investment must be made in new equipment . .Tools ,dies,molds,fixtures,and gages. The process must decide what tooling is required for each processing step.The actual design

    11、and fabrication of these tools is usually delegated to a tool design department and tool room ,or an outside vendor specializing in that type of tool is contacted. Methods analysis . Workplace layout ,small tools ,hoists for lifting heavy parts ,even in some cases hand and body motions must be specified for manual operations .The industrial engineering department is usually responsible for this area. .Work standards. Work measurement techniques are used to set time standards for each operation . .Cutting tools and cutting conditions. These must be specified for machining


    注意事项

    本文(机械专业毕业设计外文翻译--工艺规程制订)为本站会员(泛舟)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583