欢迎来到毕设资料网! | 帮助中心 毕设资料交流与分享平台
毕设资料网
全部分类
  • 毕业设计>
  • 毕业论文>
  • 外文翻译>
  • 课程设计>
  • 实习报告>
  • 相关资料>
  • ImageVerifierCode 换一换
    首页 毕设资料网 > 资源分类 > DOCX文档下载
    分享到微信 分享到微博 分享到QQ空间

    外文翻译--装配线平衡问题的求解方法浅析

    • 资源ID:116416       资源大小:27.47KB        全文页数:10页
    • 资源格式: DOCX        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    外文翻译--装配线平衡问题的求解方法浅析

    1、1 附录 The Methods for Solving the Problem of Balancing an Assembly Line10 Currently, along with the market changing, some forerunners production mode got an extensive application in the manufacturing industry. How raise a whole efficiency of assembling the production line, reduce a work preface in th

    2、e ware, and pursue to synchronize production is valued by more and more people. The production of manufacturing industry is most likely after carrying on subdividing to turn of have another a work preface flowing water to turn a continuous homework production line, at this time because of division o

    3、f homework, the time of each work preface operates cant completely the same in theoretically and physically, this phenomenon that certainly will lead to a work preface homework burden unbalance. In addition to losing, result in the meaningless man-hour also result in a great deal of work preface pil

    4、e up, sometimes will result in the abeyance of production line. Assembly line balance is a kind of means and method for resolving an above-mentioned problem, it is to make all work carry on equally, carrying on a research to the homework, carrying on a measurement to time, making the Assembly line m

    5、oving smoothly. The assemble is the last link of production, assembling process mainly with the gearing of parts, tightly solid in lord; secondly allied connect, press to pack and add to note various work to lie quality and quality examination of work preface, sometimes still want to choose to pack

    6、according to the customer intention. The whole assemble homework is complicated, belonging to a labor an intensive type engineering. Therefore, the balance of exaltation assembly line has important realistic meaning to exaltations production efficiency of the car assembly line. The assembly line equ

    7、ilibrium problem is the long-lost type of a type of typical model the combination is excellent to turn a problem, particularly is for random, many the assembly line equilibrium problem of target, solve to 2 the satisfaction seldom more on a certain degree. Mainly is divided into the following 3 aspe

    8、cts to the research of assembly line equilibrium problem currently: Give the rhythm of the assembly line certainly beg minimum work station number, usually in the assembly line of design and install the stage carry on; The minimum work station given to settle assembly line number, make the rhythm of

    9、 assembly line minimum, to already exist of the production line carry on adjust excellent turn; Get in work station number and rhythm of assembly line excellent turn under certain condition, all sparse assemble the burden of on-line work station, give the staff member a kind of fair feeling. Because

    10、 the balance of assembly line always long-lost type of the combination problem, we looking for the superior solution more difficult, so adopted a suitable method to resolve the assembly line equilibrium problem to cause the extensive concern of each business enterprise field and academic circles. A

    11、few typical models of water line equilibrium problem of this text aim convection solve a method to carry on more analytical; putting forward resolving that problem can go a method. The assembly line equilibrium problem is a typical NP-hard to crack, currently, the method which solves this kind of pr

    12、oblem can return to knot to 3: Inspire type method, superior turn method (mathematics model method) with industrial engineering method. Superior turn method is the superior solution that passes establishment mathematics model to look for a problem. Though the mathematics model method can find out th

    13、e superior solution, the physically applied hour is very tedious; Usually a pimping problem model that need to be constructed very big, the calculator consumes hour also more. Below I will make analysis use linear programming method and dynamic state program method. The linear programming (Linear Programming, brief name LP) problem is a target function peace treatys tying conditions are the all lines and superior to turn a problem. The line programming is the superior to turn one of the


    注意事项

    本文(外文翻译--装配线平衡问题的求解方法浅析)为本站会员(泛舟)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583